New Gallery Update Photographs |
||
Looking south east to the library. |
|
|
![]() Framing in the two office areas where one became eventually the sporting and firearms room. |
|
This hole was dug on the inside of the building under the main pillar. |
Front of elevator to mezzanine. |
|
|
Fire door from the rental store. This will be raised and then insulated and framed so it will be enclosed in the wall. |
|
|
![]() Marylee standing on the mezzanine before the roof is opened up. |
|
|
![]() A new concrete floor for the garage area. |
|
|
![]() Pouring of cement under the center pedestal at the front of the gallery section. |
|
![]() Opening the floor on the second level for the plumbing. |
![]() |
![]() The clear story or atrium being closed in before the snow flies. |
![]() The view of the atrium opened from the west looking east on the main floor. |