Looking south east to the library.


Cutting out the cement floor in the basement for the residential lift.


We need to reinforce the foundation area at the center pillar on the gallery side. Over ninety years, the beam had sagged about three inches.


Framing in the two office areas where one became eventually the sporting and firearms room.


Looking toward the framed library area.


This hole was dug on the inside of the building under the main pillar.

Front of elevator to mezzanine.


Front of mezzanine looking north.


From mezzanine looking west.


Fire door from the rental store. This will be raised and then insulated and framed so it will be enclosed in the wall.


Revised closet area near the library.


Framing in the wall to cover the old fire door between the rental store and our gallery.


Marylee standing on the mezzanine before the roof is opened up.


Marylee standing on the roof where the atrium will come through the roof.


Looking at the second floor roof area.


A new concrete floor for the garage area.


The clearstory or atrium begins.


Pouring of cement under the center pedestal at the front of the gallery section.


Marylee reviewing her Christmas cards on the new mezzanine.


Opening the floor on the second level for the plumbing.

The clear story or atrium being closed in before the snow flies.

The view of the atrium opened from the west looking east on the main floor.

Previous Page

Next Page

Have questions about these images?
E-Mail Meadowlark Gallery!

Biography Library / Bronze / Collectibles / Etchings / Paintings / Pen and Ink / Graphite / Working Decoys

Gallery Credentials / Firearms / Triangle Z Ranch Furniture / Gallery Tour / Customer Percs