New Gallery Update Photographs |
||
|
|
|
The floor joists are exposed for the stairway area to the basement. |
|
This is the first leg of the I beam structure heading south. |
An exposed pedestal beam. |
|
|
![]() Looking down the hallway from the top of the stairs. |
|
|
|
|
|
![]() Rough stairway to the basement from the main floor. |
![]() South side of the gallery.
|
![]() Floor area of the framing area.
|
|
![]() The front of the buildings is being exposed for the ledge to be welded to the I beam for the new brick front. Also you can see that the false front over the rental area is being cut down to give a nice distinction between the two businesses.
|
Framing for residential lift. |
|
Looking north into the library area. |
||